Tight budgets
Mono PERC
The proven workhorse. Lower cost per panel, with reliable output for utility and commercial builds.
Modules are the biggest line on your bill of materials, and the one that hurts most when it arrives wrong. We check every solar panel supplier on certification, manufacturing capability and trade history before it can quote you, every quote answers to the spec you post, and we can fund up to 100% of the order.
Technology, wattage and volume is enough to start. A procurement specialist replies within one working day with how much of the order we can fund.
Got it. You'll hear from us within one working day.
Keep your supplier quote handy, it's the fastest way to a number.
Taking you to your dashboard to post the requirement. Go there now.
Before you sign a module order
The questions that decide whether an order with new solar panel suppliers goes well, and what we do about each one.
You
VyaparCred
Tier-1 is a bankability ranking. It tracks which manufacturers' modules banks have financed in large projects, and it tells you nothing about the batch you're about to buy.
So we check the factory instead of the label. Before a solar panel supplier can quote you on VyaparCred, we check its certifications, its manufacturing capability and its trade history. One that hasn't cleared all three can't respond to your requirement.
How to check a supplier's capabilityYou
VyaparCred
Then the tolerance belongs in the requirement, not in a follow-up email. Ask for positive-only power tolerance and flash test data for the pallets you're buying, and write both into the spec.
Every quote on VyaparCred answers to the spec you post, so you're choosing between solar panel suppliers who've seen it, not discovering the gap on delivery. Documents, inspection and milestones are then tracked on the order in one place.
What documents to ask a supplier forYou
VyaparCred
Which is why that's where financing does the most work. We pay the manufacturer against your confirmed order, up to 100% of its value, with a funding decision within 48 hours of a complete requirement.
Pre-vetted deals need no separate collateral, so the cash you'd have parked in panels stays free for labor, racking and the next site.
How pre-shipment financing worksModule buyer's checklist
Six checks that separate good solar panel suppliers from expensive mistakes. We run two of them on every manufacturer before it can quote. The rest belong in your requirement.
Skip the legworkDesign qualification and safety certification, the baseline for any module. When you compare quotes, make sure the certificate names the model you're actually ordering.
A real factory and production line behind the quote, and a record of shipping from it. A manufacturer with no history is a risk you'd be carrying alone.
US installations generally require listed equipment, and UL 61730 is the safety standard modules are listed to. Ask for the listing with the quote, not after the container lands.
Positive-only tolerance means no panel ships below its nameplate rating. Put it in the spec, together with flash test data for your pallets.
Compare first-year and annual degradation and the performance warranty behind them, then weigh that warranty against how long the manufacturer has been trading.
Freight, terms and delivery change the real price per watt. Quotes on VyaparCred come in on a landed-cost basis, side by side.
Module technologies
Every mainstream module technology, from solar panel suppliers checked before they quote. Efficiency figures are typical, so confirm the datasheet for the exact model.
Tight budgets
The proven workhorse. Lower cost per panel, with reliable output for utility and commercial builds.
Best all-round value
More output from the same footprint, and it holds up better than PERC in heat and low light.
Peak performance
Top-tier efficiency and the lowest long-term degradation, for builds where every watt per square foot counts.
Extra yield
Collects light reflected onto the rear side, which pays off on open, reflective ground.
Match it to your build
See it on your own order
Set the order value and the deposit the manufacturer wants before production. That deposit is cash you'd otherwise lock into panels for months.
Illustrative only. Final funding share, tenor and pricing depend on your order, supplier and credit assessment.
Buying modules on VyaparCred
Technology, wattage, tolerance, volume and delivery window. A current quote helps, but you don't need one to start.
Only manufacturers who've cleared verification can respond, on a landed-cost basis, usually within 24 to 48 hours.
How much of the module order we can fund, over what tenor and at what cost. There's no application fee.
Funds go to the manufacturer against your order, and documents and milestones are tracked until the modules land.
Send the module spec before end of day, and indicative terms reach your inbox the next working day.
Send my requirementFinancing
Two ways module buyers fund the order without tying up working capital.
When the manufacturer wants a deposit before production
We pay the manufacturer against your confirmed module order, up to 100% of its value, with a funding decision in 48 hours.
How pre-shipment financing worksWhen you're importing and the manufacturer wants a letter of credit
Letters of credit and multi-currency settlement for imported modules, attached to the order instead of run as a separate bank process.
How trade finance worksLearn before you buy
FAQ
Technology, wattage and volume gets you checked solar panel suppliers, side-by-side quotes and a funding number. No cost to talk.