Proven and economical
Mono PERC
The mainstream cell for cost-sensitive module lines.
Cells decide what your line can make, and a batch with loose efficiency bins or hidden cracks costs you twice: once in yield, again in returns. We check solar cell suppliers on certification, manufacturing capability and trade history before they can quote, and we can fund up to 100% of the order.
Technology, format, efficiency bin and monthly volume are enough to start. A procurement specialist replies within one working day.
Got it. You'll hear from us within one working day.
Keep your supplier quote handy, it's the fastest way to a number.
Taking you to your dashboard to post the requirement. Go there now.
Before you order cells
What changes when solar cell suppliers are checked before they quote.
You
VyaparCred
Then the bin belongs in the requirement, with the tolerance you can live with. Mixed bins mean mismatch losses in every module you build, so specify the efficiency bin and color sorting, and every quote answers to them.
And the only solar cell suppliers able to bid on it are ones that have passed our checks on certification, manufacturing capability and trade history.
You
VyaparCred
That's the first thing to settle. M10 cells use a 182mm wafer and G12 cells a 210mm wafer, and your stringer and module layout decide which your line can take.
Put the format in the spec, and suppliers quote only what your line can actually use.
M10 vs G12, comparedYou
VyaparCred
Ask for EL images of the batch before it ships, and write a breakage tolerance into the requirement, so inspection happens before the money's gone rather than on your stringer.
Documents, inspection and milestones are tracked on the order in one place.
Fund the batch before it shipsCell buyer's checklist
Six checks that keep your module line fed with cells it can actually use. We handle the first pair before any maker can bid; the other four go in your requirement.
Line up checked cell makersChecked before the supplier can quote. Confirm on the quote that it covers the cell type and format you're ordering, so finished modules have a clean path through IEC testing.
Manufacturing capability and trade history, checked before any quote reaches you.
M10 (182mm) or G12 (210mm), matched to your stringer and module layout before you order.
Tight bins and consistent color, so modules don't lose output to mismatch or fail on appearance.
Electroluminescence images of the batch and an agreed breakage tolerance, before the balance is paid.
A cheap cell that ships expensively isn't cheap. Every bid shows the delivered cost, next to its rivals.
Cell technologies
Every mainstream cell technology in M10 and G12 formats, from solar cell suppliers checked before they quote.
Proven and economical
The mainstream cell for cost-sensitive module lines.
Higher efficiency
TOPCon cells deliver more output than standard PERC, and they're now the default on many new lines.
Top efficiency
High efficiency and low temperature losses, for premium module lines.
Match it to your line
See it on your own order
Set the order value and the deposit the cell maker wants before production. That's cash your line could be using.
Illustrative only. Final funding share, tenor and pricing depend on your order, supplier and credit assessment.
Buying cells on VyaparCred
Technology, format, efficiency bin, color sorting and monthly volume.
Only makers who've passed verification can bid, and bids typically land within 24 to 48 hours, priced delivered.
What we'll fund on this cell order, for how long and at what price, with no fee to apply.
We pay the cell maker directly against your order, and you follow each milestone until the pallets reach your stringer.
Share the spec today and indicative terms follow the next working day.
Send my requirementFinancing
Two ways module makers fund cell orders.
When the cell maker wants a deposit before production
Cover up to 100% of a confirmed cell order, paid straight to the maker, with a decision on funding inside 48 hours.
How pre-shipment financing worksWhen you buy cells every month
Monthly cell supply on 90-day terms for you, with the cell maker paid at T+2 through a vendor payment program.
How vendor payment programs workLearn before you buy
FAQ
Technology, format and volume gets you checked solar cell suppliers, landed-cost quotes and a funding number. No cost to talk.